Aerial drone photograph of the Indooroopilly rail bridge, Brisbane
CASE STUDIES

Recent capture programs

Real assets, real deliverables, and the numbers that came back. Full write-ups publish here as each program clears for release.

Aerial drone photograph of the Indooroopilly rail bridge over the Brisbane River during the inspection program

Time-Critical Asset Remediation Inspection — Indooroopilly QLD

LIVE RELAY DURING QR TRACK POSSESSION

Point cloud of the Tingalpa Reservoir spillway from an AI crack detection survey

Spillway crack detection — dam infrastructure

AI DEFECT MAPPING · CRACKS TO 0.2 MM

Telecommunications tower close visual inspection, Redland Bay

Asset remediation inspection — condition record

CLOSE VISUAL INSPECTION · NO ROPE ACCESS / EWP

Under-deck view of the Story Bridge with containment netting during a drone inspection

Under-bridge inspection — Story Bridge, Brisbane

CVI PROGRAM · SEQUENCED WITH LIVE REMEDIATION WORKS

NOTE

Why the write-ups are staged

Hover publishes case studies with verifiable numbers and client-safe imagery only. Each study releases here once its data and imagery are cleared — no invented metrics, no borrowed stock photography.

NEXT STEP

Scope this for your site

Send the asset and the deliverable you need — a scoped method and quote comes back within one business day.

Request a technical quote

HARRY BILLING — CHIEF REMOTE PILOT
0411 445 458
[email protected]
CASA ReOC #9398 · $20M PUBLIC LIABILITY